Key process steps process steps for Cell Manufacturing

Formation and Grading Towers

 

The core component of our system is the formation tower, essential for the electrical activation and testing of cells post-electrolyte filling. These towers perform charging and discharging cycles to develop a uniform SEI layer within the cells and assess key characteristics such as cell capacity, internal resistance, and peak performance.

 

Key Features

 

Fully Integrated Systems: Formation towers come as fully integrated units, incorporating charge/discharge electronics, measurement instrumentation, controls, and formation chambers. Installation is streamlined, requiring only a connection to utilities—no additional cabling or interfaces needed.

 

Versatile Electronics: PEC provides both regenerative and linear electronics tailored to the system’s current and density requirements.

Streamline your Cell Testing & Manufacturing.